Maintenance
Prevention pays off:
- Increased process reliability
- Early detection of wear-related failures
- Avoidance of consequential damage
- Extension of the service life of the machine
- Higher resale value
- On-site service by competent MEBA service professionals
- Original MEBA spare and wear parts
MEBAcheck:
- Strip geometry
- Band saw blade guide
- Cutting pressure
- Clamping jaw geometry
- Intervertebral disc storage
- Belt speed
- Saw frame feed
- Belt tension
- Round and flat brushes
- Magnetic tape
- Micro and cooling system
- Visual inspection of switch and control
- Drive control
- Length mitre angle
- Check for tightness of the hydraulics
The price listed is calculated for orders from Germany and Austria. Requests from other countries will receive the exact price on the order confirmation. Implementation period 4 weeks after receipt of the order as part of a collective assembly. Price incl. travel and working time allowance. Spare parts are billed cost-effectively. Limited to one man-day (8h). Payable by invoice immediately net.
Super Service!